Layout, excavation, trucks, and a lot of dirt. What the first week of building a custom gunite pool in Largo looks like and what you need to do.
You have signed the contract, picked the finish, and watched the design go from a sketch to approved plans. Then one morning, a truck backs up to the side yard, and your quiet backyard turns into a construction site.
Week one is exciting and a little chaotic. Knowing what to expect makes it a lot easier to enjoy. If you want the full picture from design to first swim, see our pool building process.
Before the first shovel
By the time crews arrive, a lot of work has already happened behind the scenes. Permits have been approved through the City of Largo or Pinellas County, and utility lines have been marked so the dig can avoid them. If your home has an HOA, its approval should be done too.
You will usually get a call or message confirming the start date and what to expect on day one.

Day one: layout
The first visit often looks simple. The crew walks the yard, confirms access, and paints or stakes the outline of the pool on the ground based on your plans. It is the first time you will see the actual size and position of the pool in your yard.
This is a good moment to take a careful look. Stand where you will sit on the patio. Look from the kitchen window. If something seems off compared to the plans, speak up now. Small adjustments to placement are much easier before digging starts.
Excavation
Once layout is confirmed, excavation begins. Expect:
- Heavy equipment. An excavator and trucks will need a clear path to the backyard.
- Noise. Digging and truck traffic are loud for most of the workday.
- Dirt. A lot of it. Some will be hauled away, and some may be kept on site for backfill or grading.
- Changes to your lawn. The access path will take a beating. Restoring it is usually part of the end of the project.
In parts of Pinellas County, the water table can sit close to the surface, and some yards hit sand, shell, or old fill. If the crew runs into water or unexpected soil, they may need to pump the hole or adjust the plan, which can affect the next few days.
After the dig
With the hole shaped, the crew sets forms for the pool's edge and starts preparing for plumbing and steel. LIV builds custom gunite pools, which means a framework of steel rebar is installed and the concrete shell is sprayed on site. That spraying usually happens after week one, but the prep starts right after excavation. For how the remaining phases add up, read how long it takes to build a pool in Tampa Bay.
Your job during week one
- 1Keep the access path clear. Move cars, trash cans, and anything along the side of the house.
- 2Protect what you care about. Relocate potted plants, outdoor furniture, and decorations away from the work area.
- 3Plan for pets and kids. An open hole is a real hazard. Keep gates closed and children and pets inside or away from the area.
- 4Share gate codes and let the crew know how to reach you.
- 5Ask where dirt and materials will be staged so nothing ends up where you did not expect it.
- 6Give your neighbors a heads up. A friendly note about noise and truck traffic goes a long way.
What week one is not
It is not the week you will see the pool take shape. A hole in the ground can look much smaller or bigger than you imagined, and that is normal. The shape and size become clearer once the steel goes in and the shell is sprayed.
It is also not the time for big design changes. Moving the pool, changing its depth, or adding a major feature after excavation can mean new engineering, new permits, and delays. If you are rethinking something, talk to your project manager right away so they can tell you what is still possible.
Weather and the schedule
Summer afternoon storms can stop work for the rest of the day and leave the hole full of water that has to be pumped out before work can resume. That is a normal part of building a pool in Florida, and your project manager will update you if the schedule shifts.
Questions to ask your project manager
- Who is my main point of contact during construction?
- What is the next milestone after excavation?
- Will I get updates by text, phone, or email?
- When should I expect inspections?
- What should I do if I notice a problem on site?
Ready to start planning? Talk with LIV Pools, a pool builder in Largo with a local showroom, or learn more about us as a swimming pool contractor serving Tampa Bay.
Common questions.
Usually not, as long as the crew has access. Being available by phone helps.
Work may pause, and the hole may need to be pumped out. Your project manager will keep you updated.
Ask how grading and lawn restoration are handled at the end of your project so you know what to expect.